KEMERI PRIMARY SCHOOL BUILDING CONSTRUCTION PROJECT DEVELOPMENT

Within the framework of the construction project,

the reconstruction of Ķemeri primary school

and measures to improve the energy efficiency of the building are planned.

The project envisages complete reconstruction of the heating system and construction of a new heating unit,

construction of a mechanical ventilation system with at least 75% heat recovery efficiency.

In accordance with the requirements specified in the energy certificate,

it is planned to replace the windows with new ones.

Insulation of the outer walls of the facade of the extension of the gymnasium,

renovation of the existing water supply.

It is planned to replace the lightning in the building with LED luminaires.

An overview of fire safety measures has been developed and changes to the layout of the building are planned

in accordance with fire safety requirements and environmental accessibility requirements.

Lightning protection is provided for the school building in accordance with the requirements of regulatory enactments.